Q1:Do I need to issue the QR Code immediately after receiving the Activation URL?

A: ❌ No, you do not need to issue it immediately.
🕒 Newly applied eSIMs have a 45-day QR Code issuance period.

Recommendation:
✅ Issue the QR Code before departure.
✅ This prevents the usage period from starting early due to flight changes, typhoons, or trip cancellations.

Q2:What does “Complete operation within 44 days, automatically activated on the 45th day” mean?

A:
This means:

📌 The Activation URL operation period before pressing “Issue”.
⏰ Please complete QR Code issuance within 45 days after receiving the Activation URL.
⚠️ If the QR Code is not issued after 45 days:
➡️ The system will automatically start counting the usage period.
➡️ The countdown will begin even if you are outside Japan.

Q3:Will the usage period start immediately after pressing “Issue”?

A:No.
Pressing “Issue” only generates the QR Code.
The usage period does not start immediately after issuance.
The following steps must be completed:
1️⃣ QR Code issuance
2️⃣ eSIM installation
3️⃣ Arrival in Japan
4️⃣ Smartphone connects to the docomo network
➡️ The eSIM will then be officially activated and the usage period will begin.

Q4:How is the usage period calculated?

A:
After eSIM activation:
🇯🇵 The usage period is calculated based on Japan Standard Time (JST) calendar days.
Example:
📅 7/14: Issue and install eSIM in Taiwan
📅 7/15: Arrive in Japan and connect to the docomo network, will be counted as Day 1.

Q5:Can I issue the QR Code during system maintenance?

A: System maintenance time: Every Tuesday 22:00~Every Wednesday 09:00 is the system maintenance period.
✅ Please complete QR Code issuance before Tuesday 22:00.
⚠️ If you operate during maintenance:
・The status may remain pending.
・The QR Code will be issued after maintenance is completed.

Q6:Do I need to keep the page open after pressing “Issue”?

A:No.
After pressing “Issue”:
✅ You may close the page.
✅ Open the Activation URL again later to check the result.
📌 You can check:
・QR Code issuance status
・Activation start/end dates
・Remaining data / used data capacity